Our process

From first phone call to meter-ready, in six clear steps.

Every project — a single home or a 200-plot scheme — moves through the same six-stage process. Same paperwork, same standards, same team.

  1. 01

    Enquiry

    Send a postcode, expected gas load and target date. You'll receive a same-day feasibility response confirming mains distance and any obvious constraints.

  2. 02

    Site Assessment

    A qualified engineer visits (or reviews drawings for developments) to confirm meter position, access routes and any highways, private-land or reinstatement considerations.

  3. 03

    Design & Quotation

    We produce a fixed all-in quotation with CAD drawings, GT reference and a scope you can actually challenge. Prices are valid for 90 days.

  4. 04

    Utility Approvals

    We handle Gas Transporter adoption, street works notices under NRSWA, permits, traffic management and any landowner wayleaves.

  5. 05

    Installation

    Excavation, live mains tap-in, service pipe pulled through, purge and strength test, meter box installed and site fully reinstated to specification.

  6. 06

    Meter Ready

    Signed off with a certified handover pack ready for your energy supplier (or MOP/shipper on commercial sites) to fit and commission the meter.