From first phone call to meter-ready, in six clear steps.
Every project — a single home or a 200-plot scheme — moves through the same six-stage process. Same paperwork, same standards, same team.
- 01
Enquiry
Send a postcode, expected gas load and target date. You'll receive a same-day feasibility response confirming mains distance and any obvious constraints.
- 02
Site Assessment
A qualified engineer visits (or reviews drawings for developments) to confirm meter position, access routes and any highways, private-land or reinstatement considerations.
- 03
Design & Quotation
We produce a fixed all-in quotation with CAD drawings, GT reference and a scope you can actually challenge. Prices are valid for 90 days.
- 04
Utility Approvals
We handle Gas Transporter adoption, street works notices under NRSWA, permits, traffic management and any landowner wayleaves.
- 05
Installation
Excavation, live mains tap-in, service pipe pulled through, purge and strength test, meter box installed and site fully reinstated to specification.
- 06
Meter Ready
Signed off with a certified handover pack ready for your energy supplier (or MOP/shipper on commercial sites) to fit and commission the meter.