Temporary Gas Supplies for Sites and Events
A temporary gas supply gives you a compliant, metered connection for a defined period — typically construction welfare accommodation, a decant site or a public event. We design the supply around your load and duration, install it, and remove or convert it when the programme ends.
What the work involves
- Establishing the load, duration and metering requirement for the temporary period
- Designing the route from the mains network to the temporary meter position
- Network liaison and the relevant temporary connection approvals
- Installation of the service, meter and housing to a safe, secure position
- Commissioning and tightness testing before handover
- Disconnection, removal and reinstatement at the end of the period, or conversion to a permanent supply
Who this is for
How it works
- 1
Tell us about the site
Send us the address or postcode, what you need and any drawings you already have.
- 2
We survey and design
We establish where the mains network is, what load you need and what the site conditions allow.
- 3
You receive a fixed quotation
A written price covering the full scope up to your meter position, with no obligation to proceed.
- 4
We programme and install
Once accepted, we book the works, carry out the excavation and connection, and reinstate the ground.
Why choose Castlerock Gas
Accredited contractors
Work is delivered by fully accredited contractors holding GIRS registration and ISO 9001, 14001 and 45001 certification.
One point of accountability
We handle design, network liaison, approvals and installation, so you are not chasing several parties for one connection.
A fixed, no-obligation quotation
You get a clear written price for the scope, with no sales pressure and no surprise fees added later.
Frequently asked questions
How long can a temporary gas supply stay in place?
Temporary supplies are agreed for a defined period set out at design stage. If the programme extends, the period can usually be varied, and in many cases a temporary supply can be converted to a permanent connection.
What does a temporary gas supply cost?
Pricing depends on the distance to the mains, the load, the duration and the reinstatement required at the end. We quote a fixed price for the full scope once we understand the site.
Can the temporary supply become a permanent connection?
Often yes. Where the position and capacity suit the finished scheme, the temporary supply can be designed from the outset so it converts to the permanent connection, which avoids paying twice for excavation.